ALMA @ Burnaby Mountain

ABOUT THE PROJECT

ALMA @ Burnaby Mountain is a vibrant new community envisioned at the heart of the emerging Burquitlam Transit-Oriented Area (TOA). Strategically planned at the base of Burnaby mountain, just 300 metres from Burquitlam Station and only a 15-minute bike ride or 5-minute drive from Simon Fraser University, the project is uniquely positioned to meet the growing demand for diverse, high-quality housing in Burnaby. By expanding rental options and introducing the first Purpose-Built Student Accommodation (PBSA) in Burnaby, ALMA @ Burnaby Mountain is designed to relieve pressure on the traditional rental housing market while strengthening the fabric of the wider community.

More than a place to live, ALMA @ Burnaby Mountain is envisioned as a cornerstone of future community life and a catalyst for connection. Thoughtfully planned around the power of social spaces, the community is intended to foster everyday interaction, wellbeing, and inclusivity. Proposed amenities will go far beyond the typical, with facilities including a wellness club for fitness and recreation, co-working spaces for collaboration, study lounges and meeting rooms designed with students in mind, and gathering areas to host programs and events that build community. Together, these spaces are designed to create intuitive, effortless living where daily essentials and opportunities for connection are always close at hand.

The development is planned in two phases and will feature four highly articulated mid-rise buildings with taller elements ranging from 6 to 16 storeys. Together, they are set to deliver approximately 1,500 units and more than 2,000 beds:

  1. Phase 1:  Approximately 1,000 purpose-built student accommodation (PBSA) units, the first of its kind in Burnaby.
  2. Phase 2: Approximately 500 purpose-built rental (PBR) units.

Complementing the housing will be approximately 70,000 square feet of indoor and outdoor amenity space and 30,000 square feet of commercial space, creating a carefully envisioned environment that integrates student housing, rental living, community spaces, and neighbourhood-serving retail.

At its core, ALMA @ Burnaby Mountain embraces the belief that both students and the wider community thrive when wellbeing, design excellence, and social connection are prioritized.

Proximity & Connectivity

ALMA @ Burnaby is ideally located for PBSA  at the base of Burnaby Mountain, offering strong connections to transit, education, and community amenities.

  • Simon Fraser University – 3.5 km away (15 minutes by bike or 5 minutes by car)
  • Burquitlam SkyTrain Station – 300 metres from the site with direct regional access
  • Transit-Oriented Area – Within the Burquitlam TOA, linking to SFU, BCIT, and the wider Metro Vancouver region
  • Everyday Access – Walkable to food, retail, and services not available on Burnaby Mountain

Location Advantages

  • Introduces Purpose-Built Student Accommodation (PBSA) in Burnaby, providing much-needed off-campus housing options
  • Positioned within a growing high-density hub at Broadway and North Road, adjacent to Coquitlam
  • Part of a neighbourhood transitioning into a vibrant mixed-use community with retail, residential towers, and new public spaces
  • Supported by Burnaby’s long-term growth strategy, Bill 47, and updated transit-oriented policies enabling up to 12 storeys within 400 metres of SkyTrain

APPLICATION DOCUMENTS

Behind every new ALMA community is a team of experts working together to shape thoughtful, well-designed spaces. Each proposal brings together insights from architects, planners, and consultants to ensure our projects reflect both vision and responsibility.

Here, you’ll find all of our submission materials—like architectural drawings, planning rationale, and supporting reports—so you can see the full picture of how our communities come to life.

DESIGN HIGHLIGHTS

Wellness Club

Golf Simulator, Indoor Cycling Studio & Pilates Studio

SkiCycle Hub

Maintenance shop for bike and ski enthusiasts

Arcade and Games Room

An e-sports and gaming arena + ping pong room

Library + Study Spaces and Focus Rooms

Meeting rooms and quiet spaces to help study and focus

Coastal Adventure Club & Outdoor Space

Outdoor hot tub/sauna, fire pit, a rooftop or courtyard with local flora, green, shaded outdoor seating space, a panoramic view deck for study or socializing & a rooftop running track or garden area

Aurora Lounge & Village Hub

Mix and mingle, dine or lounge in multiple social and community spaces allowing residents to connect and unwind

Podcast, Video + Art & Craft Studios

Get creative in a variety of innovative zones. Start or record your latest podcast episode or paint your next masterpiece

Recovery & Wellness Space

Recharge in an indoor biophilic space and indoor garden

Sky Observation

To blend science, culture, and mindfulness by giving students an opportunity to explore astronomy through telescopes and planetarium-style tech while learning about Indigenous cosmology

ENGAGE WITH US

We welcome feedback or any questions you may have about this project by reaching out to [email protected]

PROJECT TEAM

vdzLogo
hatch_-_logo
Geo_Logo
Alpin-martin
designagency
Gensler-logo_blk
LogoPNGBlackNew
Urban Strategies
acl_arbortech_logo-nobg
pinchin-logo
bunt_logo

    Contact Us